The First Big Hole Well of Geothermal Project Performed Cementing Job Successfully in Indonesia
2023-05-29With the requirement of the international clean energy market, the Indonesia government make effort to develop geothermal wells. WJR 1-2 is the first well of geothermal big hole well for PT OPT. Before the project began, PT OPT management team made the enormous preparations from technology, personal and equipment. On 28 May, we have done the 18.58 inch casing job. we pumping total 500 bbls cement slurry. The operation process went smoothly and client was very satisfied with PT OPT team. Till now. we finished 24 inch casing job, 4 plug job with TOC slurry system, 2 squeeze job and 18.58 inch casing job. We will face the 13.38 inch casing job in 10 days later. PT OPT team will do our best for this stage.
-
- 2024-05-17
OPT Achieves Grand Success at the 48th Indonesia International Petroleum Exhibition
Jakarta, May 14, 2024 – The 48th Indonesia International Petroleum Exhibition (IPA 2024) kicked off at the Jakarta International Expo (ICE) .
-
-
- 2024-03-02
OPT Will Invest in New Factory in Dongying, China
OPT Will Invest in New Factory in Dongying, China to Achieve Large-scale Production of Oilfield Chemicals...
-
-
- 2024-01-19
HSE Staff Training
Recently OPT KSA organized an HSE training course, which was conducted by our professional HSE team, who adopted a new training model and teaching methodology to ensure that employees could easily understand, accept and practice the relevant safety knowledge and skills. We believe that these trainings will help to improve the emergency response capability of our staff and enable effective prevention and control of potential hazards....
-